A1 Complete Builders have been awarded this project based on purely our reputation and ability to “produce quality work”. [My Clients Words]
A very spacious site make working much easier than some of our less spacious sites in the past. A new two bedroom bungalow being built close to the sea just adds to this prime location in this popular village. The ground conditions are unfortunately not suitable to have the normal concrete foundation and therefore piling is required. These piles will be drilled around 10 meters in to bedrock and in total 17 piles will be placed around the foot print of the Building.
Carnon Contractors will be responsible for these works and A1 has over all responsibility as principle contractor. A1 Complete Builders will then make steel beam cages on site and fit on top of and around the 17 piles in question. Once the cages are in place we will then pour concrete over to tie the whole structure together in place.
A video will be made of this process and can be viewed in our video section.
All windows supplied by C.A.W. Electrics by York Electrics and Plumbing by Ollie Plumbing and Heating.
Duration of time on site 6 months
Project Complete – View 360 panoramas here